Over the winter, while the rest of us were wondering if the cold weather would ever end, the construction crew at the New Studio have been busy. With the building closed in and insulated, even the below-zero weather did not slow them down. On New Year’s Day, the cellulose insultation was blown into the wall cavities. The VESDA (Very Early Smoke Detection Apparatus) was installed, along with the security system. The stainless steel pipes for the high-pressure mist fire suppression system were laid into the attic. A large sample of the “barge board” was created and approved by the architect. In the photo at right, the head contractor Rich Rappleyea shows off the woodwork sample, made of solid mahogany so that it will last at least 50 years. Now, with the weather turning at last, the crew will turn to work on the exterior once again.