The Windows Are In

This is the view of Thomas Cole’s house from the brand-new window on the north side.

Betsy JacksThe Windows Are In

Barge board of solid mahogany

Over the winter, while the rest of us were wondering if the cold weather would ever end, the construction crew at the New Studio have been busy. With the building closed in and insulated, even the below-zero weather did not slow them down. On New Year’s Day, the cellulose insultation was blown into the wall cavities. The VESDA (Very Early Smoke Detection Apparatus) was installed, along with the security system. The stainless steel pipes for the high-pressure mist fire suppression system were laid into the attic. A large sample of the “barge board” was created and approved by the architect. In the photo at right, the head contractor Rich Rappleyea shows off the woodwork sample, made of solid mahogany so that it will last at least 50 years. Now, with the weather turning at last, the crew will turn to work on the exterior once again.

Betsy JacksBarge board of solid mahogany

Cast in Silver

Right now, the New Studio looks as if it were made of solid silver. The building has an unusual construction: the plywood sheathing is on the inside, attached to the wooden studs from within. The insulation, therefore, was added from the outside. What you are seeing in the photo at right is the foil coating on the insulating foam board. Underneath that layer is cellulose insulation, in between the studs. Very soon, the contractor will be putting on the siding. I’m sure the siding will be beautiful, but I do like the solid silver monument that it is right now.

Betsy JacksCast in Silver

The Roof Takes Shape

We brought in a crane this week and lifted the trusses into place. The building is taking on its final shape in this video:

Betsy JacksThe Roof Takes Shape

Meet the Project Team

As this building goes up, a team of architects and enginners are overseeing every step. Pictured at right are (left to right):

Mark Dahl, architect from Mesick-Cohen-Wilson-Baker Architects; Betsy Jacks, Executive Director of the Thomas Cole National Historic Site; Rich Rappleyea, owner of Dimensions North, the contractor on the project; Stephen Dunn, Vice President of the Board of Trustees of the Thomas Cole National Historic Site and head of the Building Committee; and Curtis Wilsey, engineer from Quantum Engineering.

Betsy JacksMeet the Project Team

Walls! And They are Tall

As I walked down the path to the New Studio construction site today, I was amazed to see a giant wall stretching into the sky. The building is taking shape. Two of the four walls are now up, and two enormous west-facing windows are framed. In the picture at right, I am standing in front of one of them. In Cole’s time, those windows would have framed an uninterrupted view of the Catskills. As I approached the building I was struck by how small the people looked in relation to the scale of the building, and it occurred to me that this was part of Thomas Cole’s design – the smallness of man. It was a beautiful sight. Do come and see this for yourself.

P.S. Don’t you want your name to be on the donor wall? Support the New Studio.

Betsy JacksWalls! And They are Tall

Thomas Cole’s Stones

This week I am happy to report that the foundation has been poured and the stonework on the exterior is almost complete. In the photo at right, you can see the stones being cut and carefully put in place. During the excavation of the site, the original foundation stones were saved, washed and stored on pallets. A skilled stone mason is now placing them on a concrete shelf that was built into the poured concrete foundation. The concrete portion, which you can see now, will be covered with earth when the building is complete.

Betsy JacksThomas Cole’s Stones

The Footing Is In

Construction on the New Studio is now in its second week. Today the concrete footing was poured in the morning so as to be sure to get it in before the afternoon thundershower. Rich Rappleyea, our GC, was there early to be sure it all moved along quickly. The crew was fast! The wood form was completely done by the time the cement truck arrived. Shown in the photo at right is the footing at the north-west corner and a portion of the entrance portico as it juts out.

Betsy JacksThe Footing Is In

We Officially Broke Ground Today on the New Studio

We broke ground today on the reconstruction of the New Studio! It is a day that many people have been thinking about for a long time. A groundbreaking ceremony took place on the lawn next to the foundation stones with remarks and congratulations followed by a photograph with the shovels.

In the photo above are:

Rowena Sahulee, Director of Tourism Marketing at I LOVE NY.

Vincent Seeley, Mayor, Village of Catskill.

Joseph Kosloski (behind Vincent), Legislator, Greene County.

Stephen Dunn, Trustee, Thomas Cole National Historic Site.

Warner Shook, Trustee, Thomas Cole National Historic Site.

Lisa Fox Martin, Board Chairman, Thomas Cole National Historic Site.

Stephen Shadley, Trustee, Thomas Cole National Historic Site.

John Mesick (behind Stephen), Architect.

Rose Harvey, NY State Parks Commissioner.

Nina Matis (behind the shovel), Trustee, Thomas Cole National Historic Site.

Carrie Feder, Trustee, Thomas Cole National Historic Site.

Elizabeth Jacks, Executive Director, Thomas Cole National Historic Site.

Linda Gentalen (behind Elizabeth), Trustee, Thomas Cole National Historic Site.

Hudson Talbott, Trustee, Thomas Cole National Historic Site.

Peter Lopez, NY State Assemblyman.

Michel Goldberg, Trustee, Thomas Cole National Historic Site.

Betsy JacksWe Officially Broke Ground Today on the New Studio